my account  log out
 

Anchor Extruder For Post Tensioning In Promotion

Create: 05/22/2020
Expired Date:05/22/2022
Category: Electronic
Message:Operating steps and methods of anchor extruder for post tensioning: 1.Extrusion sleeves, compression springs, extrusion dies, and top pressure heads must be matched and must not be mixed with other manufacturers' products. 2. After installing the extrusion die, check whether the alignment between the top indenter and the extrusion die is good: during the idle state, extend the piston slowly so that the top indenter enters the inner hole of the extrusion die, and then stop and check the neutrality. 3. The section of the strand used for extrusion shall be neat when cut, and shall not be skewed, and the burr or peak of the section shall be worn away. 4. The compression spring should be subjected to on-site self-test during installation: Normal conditions should be hand-crank breakable - its brittleness and hardness are relatively large. 5. Before extruding, dirt on the surface of the squeezing part of the strand end should be cleaned and a thin layer of the anchor must be applied to the surface of the inner hole of the squeezing die. At the same time, the residual spring wire in the inner hole of the top indenter should be removed to avoid that the length of the strand wrapped in the extrusion sleeve after extrusion is not enough (the cross section of the strand should be at least flush with the end face of the sleeve and should be exposed to 2 to 5 mm, Otherwise, there may be a lack of gripping force and a slipping accident. 6. Pre-rotate the compression spring into the strand, then the steel strand together with the compression spring passes through the hole in the extrusion die; secondly, the extrusion sleeve rotates slightly to insert the steel strand and the compression spring. (Squeeze springs should all be wrapped in the ends of the sleeve, allowing the exposed ends to not exceed 2mm each). 7. To facilitate centering, position the extruder so that its longitudinal centerline is on the extension of the steel strand. After the assembly (squee......url:http://www.ztmineequipment.com
City:XianCity[CN] 
Location:
 Is this a real buying request?
 

return back

Copyright © toextrade Inc. All rights reserved. Contact us